For the Project Report using the scenario

Referencing Styles : Oxford

For the Project Report using the scenario as specified above, address the LO1 to LO4 as specified below. 

AssignmentTutorOnline

Task 1

LO 1 Establish project aims, objectives and timeframes based on the chosen theme.

P1- Devise project aims and objectives for a chosen scenario addressing the chosen tile as specified above.


P2 – Produce a project management plan that covers aspects of cost, scope, time, quality, communication, risk and resources for the chosen project.

P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for completion with reference to the chosen project.
Note: For merit and distinction please refer to the Grading descriptor as specified below.

Task 2

LO2 Conduct small- scale research, information gathering and data collection, generating knowledge to support the project as specified above: 

P4- Carry out small-scale research by applying qualitative and quantitative research methods appropriate for meeting project aims and objectives for the chosen scenario.

Note: For merit and distinction please refer to the Grading descriptor as specified below.

Task 3

LO3 Present the project and communicate appropriate recommendations based on meaningful conclusions drawn from the evidence findings and /or analysis

P5 – Analyse research and data using appropriate tools and techniques for the chosen project.

P6 – Communicate appropriate recommendations as a result of research and data analysis to draw valid and meaningful conclusions for the chosen project.

Note: For merit and distinction please refer to the Grading descriptor as specified below.

Task 4

LO4 Reflect on the value gained from conducting the project and its usefulness to support sustainable organisational performance for the chosen project. 

P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and performance.